CIRA SA has the expertise and know-how enabling it to cover all components of agricultural irrigation schemes :

Rural Development

Rural development involves realizing :

The Kandadji Program for the Regeneration of ecosystems and development of the Niger valley (Detailed Preliminary Draft Study and preparation of Invitation to tender Documents for 2000 ha irrigated perimeters in total water control downstream from the Kandadji dam)

Client : Office of the Prime Minister / High Commission to the Development of the Niger Valley
Date : 2005 - 2006
Partner : TECHNI-CONSULT
Cost of the service : 315 Millions FCFA (480 215 €)

Mission

The overall purpose of the project is the development of 2000 ha of tilling lands located downstream from reserve, to the profit of populations affected by the Kandadji dam project. It is in keeping with the framework of the Kandadji program for the regeneration of ecosystems and development of the Niger valley. The mission includes the design of irrigation, drainage, networks, sanitation, service road networks, protection of hydraulic works and parcels development.

Study for the Hydro-agricultural development of 25 000 ha of irrigated perimeter with full water control, in the hydraulic system of Macina.

Client : Malibya Agriculture
Date : 2008 - 2009
Partner : LOUIS BERGER-SAS
Cost of the service : 900 millions FCFA (1 372 042 €)

Mission

The global objective of the project is the development of 100 000 ha of irrigated perimeters in the hydraulic system of Macina, as well as the construction of related infrastructures. This project will contribute to the economic development of Mali and the development of the region of Ségou in particular. The specific objective of the project is to realize "preliminary studies , engineering design, bidding documents for the hydro-agricultural development works of the 1rst tranche of 25 000 ha in the hydraulic system of Macina, as well as the construction of related infrastructures including urbanization and stock farming"

Technical-economic study for the development of the second phase of 2100 ha on the left bank from Nakambe to Bagre

Client : Bagre Work Control
Date : 2004 - 2007
Partner : PACE-KOWEIT
Cost of the service : 340 Millions FCFA (519 000 €)

Mission

In order to contribute to the achievement of food and nutritional self-sufficiency in the whole of Burkina Faso, the Burkinabe Government initiated the hydro-agricultural Project of Bagre, which aims in the long run, the development of 300,000 ha of tillable lands. The study for the development of 2,100 ha falls is in keeping with that purpose and consists of the implementation of basic studies (topography, geotechnics, soil science, agronomy, economic and financial evaluation, and socio-economy). The study also falls into the context of designing the development of the perimeter while taking into account the orientations followed as regards agricultural development, the elaboration of the hydro-agricultural master development plan, as well as hydraulic alternatives of plans, the evaluation of additional infrastructures (various tracks, villages, watersheds and buildings) and the updating of the Project costs; in particular the comparative analysis of various alternatives suggested.

Conservation and Valorization Project of the Gourma Biodiversity and Elephants

Client : Ministry of Environment and Sanitation (MEA)
Date : 2005 - 2011
Partner : BERD,SENAGROSOL
Cost of the service : 1 172 Millions de FCFA (1 786 702 €)

Mission

The project is financed by World Bank and the French Funds for Global Environment (FFGE). The project covers 18 boroughs of 3 Regions of Mali (Gao, Tombouctou, Mopti). It concerns a population of 200,000 people. Three significant outcomes are expected from it, namely:

  • Conservation areas are created and the management of their spaces by community Organizations is effective;
  • the capacity to integrate biodiversity dimension in social, economic and cultural development programs of boroughs is improved;
  • Gourma rural districts were organized to better plan and organize space management and living resources.

Maninkoura Integrated Rural Development Project (PAPIM)

Client : Selingue Rural Development Office
Date : 2003 - 2008
Partner : LOUIS BERGER S.A
Cost of the service : 374 Millions de FCFA (570 160 €)

Mission

The Maninkoura development project covering 1094 ha irrigated Perimeter (PAPIM) is meant to contribute to the achievement of food safety objective through the development of new installations in Selingue Rural Development Office covered area. Lot 1 is made up of development work over 1094 ha. It relates to the installation of irrigation, sanitation networks, protection dams and the achievement of the Selingue-Maninkoura track (40 km). Lot 2 includes the construction of 4 pumping stations and 5 pump stations and construction of an electric line over 60 km. Lot 3 relates to the completion of the rehabilitation work in the truck farming area of Selingue perimeter (60 ha).

Bagre Integrated Rural development project

Client : Bagre Work control contract
Date : 2003 - 2008
Partner : AGEIM
Cost of the service : 815 Millions de FCFA (1 242 460 €)

Mission

The project relates to the installation of 1725 ha irrigated perimeters, the achievement of a buffer stopping dam and 14 boreholes. It includes the construction of 16 pumping stations, 37 km of rural tracks, 7 water towers, 3 health centres, 6 schools and installation of 20 km electric line.

Integrated Rural Development Project of Telimele (IRDP-Telimele)

Client : Ministry of Agriculture and Livestock
Date : 2003 - 2013
Partner : GUIDE-SA
Cost of the service : 697 millions FCFA (1 062 623 €)

Mission

The Integrated Rural Development Project of Telimele, was initiated by the Government of the Republic of Guinea, and is meant to contribute to food safety, reinforce the sustainable management of natural resources, increase the monetary income of producers’ families, open-up production zones, ensure drinkable water supplying, reinforce the structuring of producers and professional organizations of Telimele prefecture. The project components are: installation and development of 675 ha of land for rice production, market gardening and fruit-bearing, the construction of 192 km rural tracks for service road, the achievement of 90 productive boreholes, the achievement of socio-medical infrastructures, an office and housing for Telimele project.

Construction of a hydrocarbon deposit in Droi

Client : Office du Niger
Date : 2012 - 2014
Partner : -
Cost of the service : 735 Millions F CFA (1 120 500,2 €)

Mission

The overall objective of the project is the improvement of offer in terms of supply and storage of oil products. The specific objective of the project is the construction of a hydrocarbon deposit in Droi (Bamako suburb) of an estimated capacity of 10,000 m3 over a surface of approximately 6 hectares. The project consists of the installation of oil products arrival and departure infrastructures, products storage tanks and their retention dikes, pumps and drains, a boiler for the vapour production.

Construction of a hydrocarbon deposit in Droi

Client : Zoumana TRAORÉEstablishments
Date : Février 2012 - Décembre 2012
Partner : INACOM Mali,Wat Wiest Gmbh
Cost of the service : 185 Millions de FCFA (282 031 €)

Mission

The overall objective of the project is the improvement of offer in terms of supply and storage of oil products. The specific objective of the project is the construction of a hydrocarbon deposit in Droi (Bamako suburb) of an estimated capacity of 10,000 m3 over a surface of approximately 6 hectares. The project consists of the installation of oil products arrival and departure infrastructures, products storage tanks and their retention dikes, pumps and drains, a boiler for the vapour production.

CIRA-SA
Conseil Ingénierie et Recherche Appliquée
BP 5016 - Bamako - Mali
Phone : (223) 20 24 32 34 / 44 90 00 64
Fax : (223) 20 24 15 03
E-mail : cira@cira-sa.com

CIRA-SA   -   2013   ALL RIGHTS RESERVED   -   LEGALS MENTIONS